Benefits to Surrounding Agricultural Lands
- Construction of Phase 1 of the SHMB provides immediate flood relief
- A single credit from the SHMB represents the creation and successful function of approximately 6,700 cubic yards of increased flood storage in the Snohomish River Basin
- Breach of lower end of Hansen dike reduces flood stages on opposite riverbank (Tualco Valley)
- Improved flood conveyance through constructed side channel complex
- Increased flood storage capacity in created floodplain wetland area
- Success of Phase 1 activities promotes construction of future Phase 2 which will provide:
- Further breaches / elimination of the Hansen dike
- Additional flood conveyance
- Additional flood storage capacity
View Flood Benefits Map |
 |
 |